
DSN&A undertakes the planning, design, and permitting of dredging
projects, including relocation of dredged materials in an environmentally compatible and cost-effective manner complying with the applicable regulations and controls for both salt water and fresh water locations.
Hydrographic/Bathymetric Surveys
Sampling Plans
Project Management
Design Coordination
Consultant Coordination
Contractor Coordination
Timeline Scheduling
Results Oriented Performance
Dredge Material Quality Assessments
Core Sampling
Laboratory Testing
Analysis of Dredge Material Test Results
Relocation Options
In-Water
Upland
Beneficial Uses
Alternative Uses
Methodologies
Clamshell
Hydraulic
Contractors
Bidding
Contract Preparation and Negotiation
Site Reviews
Final/Post Dredge Surveys
Payment Calculations
Regulatory
Application Preparation and Filing
Federal
State
Local
Application Processing
Public Hearings
Environmental Impact Statements
DSN&A also serves as coordinator for Revitalize Our Waterways and Clean Harbor Action, which have been at the forefront of the struggle to maintain environmentally compatible and economically affordable dredge material relocation options.